A semisubmersible with displacement of 19,700 long tons and KG of 50.96 feet loads 300 long tons of barite into P-tanks located 120 feet above the keel. What is the change in KG?
A
0.79 foot upward
B
1.00 foot upward
C
1.04 feet upward
D
1.83 feet upward
E
İlgili Sorular
The international body responsible for drafting the convention prohibiting marine pollution (MARPO...A damaged "T-Boat" that is unable to meet the requirements§of its Certificate of Inspection but is a...The result of two forces acting in opposite directions and along parallel lines, is an example of w...To assess the potential for progressive flooding aboard a damaged MODU, you must know the __________...46 CFR Subchapter T requires that rigid plastic or other§non-metallic piping __________.