A semisubmersible 300 feet long and an LCF of 0 (amidships) is in transit with hulls awash and an MT1" of 87.67 foot-tons. Work on the BOP (weight 263 long tons) requires that it be moved aft 12 feet. What is the resulting trim change?
A
1.5 feet
B
3.0 feet
C
6.0 feet
D
7.3 feet
E
İlgili Sorular
The owner or Master of a towing vessel shall ensure that all tests and inspections of gear take plac...What is the procedure for checking for spinal cord damage in an unconscious patient?A chain bridle is used when towing astern because it __________.When rigging a guy and preventer properly, the guy should be __________.The COASTAL DRILLER is loaded as shown in the Sample Load Form #1 (Rig Move). If the entire contents...