A jackup level at 12.5 feet draft transfers 100 kips of drill water from a tank with a TCG of -30 feet to a starboard tank with a TCG of 70 feet. The resulting starboard draft is 13 feet. The moment required to change list one inch (MCL1") is _________________.
A
667 foot-kips
B
833 foot-kips
C
1,400 foot-kips
D
1,667 foot-kips
E
İlgili Sorular
Fire fighting equipment requirements for a particular vessel may be found on the __________.Which statement about the chartlet in illustration D010NG is TRUE? (Soundings and heights are in me...For a semisubmersible moored in heavy weather conditions, the leeward lines should be paid out, and ...If a bonding cable is still required by the terminal, which statement is TRUE?BOTH INTERNATIONAL & INLAND What signal indicates doubt that sufficient action is being taken by ano...